Abstract
This study uses the method of value results (Earned Value). This study aims to determine or predict how much the cost of a project at the time of implementation and to determine the effectiveness of project control and to determine the efficiency of resource users in the form of Cost Performance Index (CPI) and Schedule Performance Index (SPI) as well as total project cost forecasts (EAC). To analyze project control, there are three parameters or indicators, namely BCWS (Budgeted Cost of Work Schedule), BCWP (Budgeted Cost of Work Performed), ACWP (Actual Cost of Work Performed). Delays and deviations can be identified by looking at the Cost Variant (CV) and Schedule Variant (SV). In the calculation of the concept, the value of the SV = -6.197.845.000 value (-) indicates that the work is running slower than the planned schedule, while the CV value = -232.750 value (-) indicates the work costs more than the budget provided. By calculating the estimated total project cost (EAC) of Rp. 15,755.722,795 while the RAB value is Rp. 15,345,000,000. this means that at the end of the project it is estimated that there will be a cost overrun of Rp.410.722.792 (2.67% of RAB).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.