Abstract

In analyzing the condition of rigid road damage, the Bina Marga method and the PCI (Pavement Condition Index) method can be used. This study aims to determine the level of road surface damage and how to handle it on the Muara Tembesi - Muara Bulian crossing, Simpang Terusan Village to Tenam Village, with a length of 2,850km and a pavement width of 7.5m. In this study, the priority order of road handling using the Bina Marga method is based on a range of values from 0 to 7, while the PCI method ranks pavement conditions from 0 to 100. The results of the assessment on the Muara Tembesi - Muara Bulian cross-road using the Bina Marga method and the PCI method (Pavement Condition Index) shows a relatively similar assessment, where the Bina Marga Method has the results that the left side with the priority order of UP = 4 and the right side with the priority order of UP = 5 and is categorized in the periodic maintenance program. While the PCI method (pavement condition index) has the result that the value of the level of damage to the left side is 88.21 and the right side is 94.78, which is included in the perfect qualification (excellent), so it is categorized in the periodic maintenance program.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call