Abstract
In a process, industrial plants have several tools that require steam to help run the processing of a material. For the heating process, PT. Petrokimia Gresik requires steam. Sometimes the steam leak during the process, which reduces the productivity of this industry. For that reason, the purpose of this calculation is to find out the steam loss during the process, especially in the urea globe control valve (PV-723, PV-726, PV-735). The result shows that the upstream pressure and temperature at PV-723 are 21 kg /cm2G and 307 oC, upstream pressure and temperature in PV-726 are 5 kg / cm2G and 158 oC, upstream pressure and temperature on PV-735 of 2.5 kg / cm2G and 138 oC. For downstream pressure on all valves is 1.03323 kg/cm2G. The obtained mass flow (F) in each valve is 0.514 tons / hr, 0.86 tons / hr and 1,902 tons / hr. The value of the input mass balance of steam in the system is 82.70 tons/hour and the overall output is74.11 tons/hour. Therefore, the total steam loss in PV-723, PV-726, and PV-735 is around 8.59 tons/hour which means there is some leak during the process that needs to do further investigation.
Published Version (
Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have