Abstract

This paper presents a case study of a large Human Factors programme applied in the nuclear fuel reprocessing industry (1987–1991). The paper outlines the key Human Factors issues addressed, as well as the impacts achieved, and gives an indication of the resources utilised (approximately 15 person-years of effort). It also considers the starting point of the programme, in terms of the factors that led to the need for such an extensive programme. Some general lessons learned are given at the end of the paper.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.