Abstract
Large-scale wind farms connected into main grid is accompanied by the reducing of the stability, reliability and security of the power system operation. So the risk cost becomes one of the important factors influencing the profit of transmission network expansion planning. This paper adopted the method of clustering wind power transmission. The objective function established in this paper reflecting the comprehensive benefits of transmission project defined the Pline (transmission capacity) as variable. In order to maximize the comprehensive benefits of the transmission project, the influence of transmission constructing cost, the congestion loss probably caused by a low transmission capacity as well as the cost of risk were taken into account. Calculation of risk is a very complex mixed integer nonlinear problem, so we used Monte-Carlo Simulation to solve this question. Example shoes that the proposed method can achieve optimal transmission capacity, transmission project benefit and planning.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have