Abstract

The mathematical model was built up for the job shop scheduling problem at first. With following the fuzzy submit time of customer requirement an improved genetic algorithm of fuzzy objective scheduling method was put forward which took the minimum production cost as the objective function. It solved the faults of the chromosomes in genetic algorithm is difficult to accurately express the complex optimization problem solution and determined the more suitable multilayer encoding and operating mode. The simulation results show that this algorithm can be applied to fuzzy object shop scheduling optimization problem, which can ensure the machine's load balance and meet the requirements of the customer delivery date.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.