Abstract

A mixed qualitative and quantitative proactive approach to explore the HFMEA process by analyzing 20 units of physiological monitors in the ICU. An HFMEA expert team of six people was formed to perform a risk-based analysis and evaluate the potential hazard index, mitigating the hazard scores and risks. From the main processes and possible failure reasons, one high-risk hazard index greater than or equal to 8 of the standard score was found. This standard score indicates the signed manufacturer's contract for maintenance was the hazard index failure mode on the parts not regularly replaced according to the contract. This systematic hazard index failure mode shows the highest hazard scores in the possible failure reason category, established as a standard maintenance procedure. In addition, the HFMEA expert analysis of the 20 units of physiological monitors within 6 months of the original and remanufactured part maintenance results in operational availability from 90.9% for self-repair to 99.2% for contract manufacturer repair. This study concludes a systematic reference in malpractices caused by maintenance negligence. The HFMEA expert team agrees that hazard failure scores greater than or equal to 8 are vital assessments and evaluations for decision-making, especially in maintaining healthcare intensive unit care physiological monitors.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.