Abstract

This paper investigates the impact of generator dispatch (dictated by cost) and locational aspects related to renewable generation connection and consequent disconnection of synchronous generation, on transient stability. As conventional synchronous generation (SG) is displaced by power electronic converter interfaced generation (PEC), the transient behaviour of the power system may change significantly due both to the changed power flows resulting from the different locations of renewables compared with thermal plant and the different dynamic characteristics of PEC. This paper uses an AC Optimal Power Flow (OPF) to determine credible, minimum cost dispatches of generation in a test network with increasing penetration of PEC in different locations. It is found that the critical locations of the system can vary significantly with respect to economic dispatch, location of disconnection of SG and location of PEC, highlighting the increasing temporal and spatial change in system dynamic behavior.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.