Abstract

The highways sector is a prominent sector in any country’s economy because of its impact on the well-being and safety of its citizens. The transport sector has an impact on social improvement and investment in the nation on the illustration that allows access to markets, production, jobs, health and other social services.This study investigates the causes of delay of highway construction projects in Iraq, which is frequent occurrence. Data was collected using questionnaires which were distributed to the key project participants; contractors, owners and consultants. The data were analyzed using the Frequency index and Spearman‟s rank correlation. The top seven causes of project delays were observed to be political decisions and political realities, the economic crisis of the country, delays in materials test of and obtaining the results, delay in monthly payments of contractor, failure treatment of the delays when implementing the project, the effects of weather, rain and high temperatures, delay in activities during implementation. It is recommended to establish an appropriate number of laboratories and adopt the field laboratory mechanism for the external and remote screens. Owners should give special attention to pay progress payment to contractors on time. The competent contractor who has prior experience in implementing the high projects should be selected. The contractor must take into consideration the weather conditions when preparing the time plan necessary to implement the project. The project management should identify these reasons and deal with them quickly in order to reduce the total delay of the project.

Highlights

  • A lot of construction projects in the world and Iraq in particular are suffering from delay in implementation

  • One of the recurring problems in the construction industry is the issue of delay, which negatively affects the success of the project in terms of time, cost and quality [1]

  • The main objectives of this study include the following: 1- To identify the causes of delays in highway construction projects in Iraq based on their frequent occurrence 2- To study the differences in views of the three major parties in any construction project, namely, owners, contractors and consultants

Read more

Summary

Introduction

A lot of construction projects in the world and Iraq in particular are suffering from delay in implementation. One of the recurring problems in the construction industry is the issue of delay, which negatively affects the success of the project in terms of time, cost and quality [1]. School projects ranked first with a response rate of 27%, followed by public buildings projects with 24% response and road projects with 21% response Note that this is due to the large number of projects implemented from these types compared to the projects of electricity and transport, for example, which received the lowest rates [5]. In Iraq, according to a survey finding that many projects suffer from a great deal of delay and due to specific factors, many projects were temporarily or permanently abandoned during the political crisis between 2003 and 2014.This factor escalates disputes to be settled by litigation process. The parties involved in the project use litigation as a last resort to settle disputes [6]

Objectives
Methods
Findings
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.