Abstract

Many firms have proceeded to the adoption of Enterprise resource planning ERP solutions to maintain competitiveness. ERP is a packaged software system that enables enterprises to integrate the operation, business processes and functions through common database. However, the majority of ERP systems do not support preventive maintenance (PM) scheduling process. The objective of PM is to minimize equipment downtime using the limited resources of an organization. Therefore, prioritizing PM activities for equipment is essential. In this paper, a fuzzy logic-based system for PM-scheduling is proposed to interpret the linguistic variables extracted from expert’s knowledge for determining equipment priorities, which could be incorporated as a custom module in ERP systems. The system was tested and proved to be reliable in solving PM scheduling problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.