Abstract

[This abstract is based on the author's abstract.] An integrated model for joint economic design of X-bar control charts and maintenance schedules is given, and expressions for expected total cost and expected cycle length are developed. Expected to..

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call