Abstract
[This abstract is based on the author's abstract.] An integrated model for joint economic design of X-bar control charts and maintenance schedules is given, and expressions for expected total cost and expected cycle length are developed. Expected to..
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have