Abstract
Blasting is a key method of controlling large-area hanging roofs and strong mine pressure in coal mine. The crack propagation direction after blasting has a decisive influence on control effect, and the existing blasting techniques have poor directionality, making it difficult to form a continuous, precise crack. A compound blasting technique (CBT) was proposed; this could achieve a precision, directional crack by using the combination of perforating bullet and explosives, with perforating bullet detonation first and then explosive blasting. The principle of directional crack formation by CBT was studied and a complete set of equipment was introduced, and the effect of continuous directional crack forming was studied experimentally. A CBT test was conducted in Tashan coal mine (Datong mining area): the results showed that a single crack surface was formed in the borehole after the compound blasting, which indicated the desired blasting effect. The CBT improves the accuracy and controllability of fractures and realizes precise directional control of rock strata.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.