Abstract

In this paper, an improved particle swarm optimization (PSO) algorithm is proposed for the resource-constrained project scheduling problem (RCPSP) which is widely applied in advanced manufacturing, production planning, and project management. The algorithm treats the solutions of RCPSP as particle swarms and employs a double justification skill and a move operator for the particles, in association with rank-priority-based representation, greedy random search, and serial scheduling scheme, to execute the intelligent updating process of the swarms to search for better solutions. The integration combines and overhauls the characteristics of both PSO and RCPSP, resulting in enhanced performance. The computational experiments are subsequently conducted to set the adequate parameters and compare the proposed algorithm with other approaches. The results suggest that the proposed PSO algorithm augments the performance by 9.26, 16.17, and 10.45 % for the J30, J60, and J120 instances against the best lower bound-based PSO currently available, respectively. Moreover, the proposed algorithms demonstrate obvious advantage over other proposals in exploring solutions for large-scale RCPSP problems such as the J60 and J120 instances.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.