Abstract

Congestion management is imperative for reliable and secure system operation in restructured power systems. Since the installation of wind farms at proper locations offers the possibility of congestion relief, this paper investigates congestion management in power systems with specific consideration of wind energy sources. The optimal location of a wind farm is determined by the Bus Sensitivity Factor and the Wind Availability Factor. Differential Evolution is a population-based heuristics algorithm used for solving non-linear optimization problems. We propose an Improved Differential Evolution based approach to ease congestion in transmission lines by generator rescheduling and installation of new wind farms. In this approach, an enhanced mutation operator is introduced to improve the performance of the Differential Evolution algorithm. A standard IEEE-30 bus system is used to evaluate the proposed algorithm under critical line outages. The simulation results show that the proposed approach is more effective than other approaches.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.