Abstract

In deregulated electricity market, Congestion Management (CM) is one of the most significant issues in order to maintain the system in secure state and to get the reliable system operation. While addressing Congestion Management voltage stability should also be taken into account. This paper elucidates an Improved Differential Evolution (IDE) algorithm to alleviate Congestion in transmission line by rescheduling of generators while considering voltage stability. Differential Evolution (DE) is one of the heuristic, population based algorithm which is well suited for solving complex and non-linear optimization problems. A Double Best Mutation Operator (DBMO) is proposed to improve DE algorithm's convergence rate. In order to validate suitability of the suggested approach, it has been evaluated on the IEEE-30 bus test system on both base case loading as well as 10% increased load. The test system has been also examined under critical line outages. The results and discussions clearly depicts the effectiveness of the projected approach in solving Congestion Management Problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.