Abstract

Software project scheduling plays an important role in reducing the cost and duration of software projects. It is an NP-hard combinatorial optimization problem that has been addressed based on single and multi-objective algorithms. However, such algorithms have always used fixed genetic operators, and it is unclear which operators would be more appropriate across the search process. In this paper, we propose an evolutionary hyper-heuristic to solve the software project scheduling problem. Our novelties include the following: (1) this is the first work to adopt an evolutionary hyper-heuristic for the software project scheduling problem; (2) this is the first work for adaptive selection of both crossover and mutation operators; (3) we design different credit assignment methods for mutation and crossover; and (4) we use a sliding multi-armed bandit strategy to adaptively choose both crossover and mutation operators. The experimental results show that the proposed algorithm can solve the software project scheduling problem effectively.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.