Abstract

Significant progress in production and information technologies and innovations in management of operations during the last couple of decades have made the production of small lots and deployment of Just‐In‐Time (JIT) concepts in flowshops possible. As a result, some researchers and practitioners have been seeking to improve the performance of non‐repetitive systems using JIT concepts. In this process, the JIT concepts that were originally designed for mass production have been modified to adapt JIT to non‐repetitive systems. This article uses a priority rule that is based on real‐time demand and production information for sequencing jobs in a kanban‐controlled flowshop. The analysis of the effect of this priority rule; the number of kanbans; the length of the withdrawal cycle; First‐Come, First‐Served (FCFS); and Shortest Processing Time (SPT) on four performance measures—customer wait time, total inventory, input stock‐point inventory, and output stock‐point inventory, shows that the use of this priority rule results in a significant reduction of customer wait time and a slight decrease in inventory.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.