Abstract

In today’s business environment, one of the most popular methodologies used to allocate manufacturing overhead cost (MOC)s on products is “ Step down Allocation Method ”. In this methodology, transferring of manufacturing overhead costs from supplementary cost centers to primary cost centers are made considering specific rules (Can, 2003:92). Also, after manufacturing overhead costs accrued in one of the supplementary cost centers are allocated to other cost centers, they can not again be allocated again (Ustun,1994:251). Consequently, sum of manufacturing overhead costs is gathered all together in primary cost centers to be allocated (Altug, 2001:225). However, in these situations, from which of cost center to start allocation becomes an important subject. Here, the sequence of allocation plays two important roles and has two different effects. The first effect of sequence of allocation is on cost centers by means of cost planning and control. The second effect is on product parties by means of production planning and product costing&pricing. In this study, the sequence of allocation of manufacturing overhead costs is tried to be presented by a hypothetical application.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.