Abstract

Abstract Part of the Central Ring Fast Autoroad in Shanghai, Beihong Vehicular Undercrossing Tunnel is a two-way, eight-lane vehicular tunnel of 126-m long, 34.2-m wide, and 7.85-m high. An electrohydraulic control system for synchronously jacked box tunneling was developed in the project. Estimation of jacking force is essential prerequisite of design of electrohydraulic system. Volume speed-regulating hydraulic circuit rather than throttle circuit was used to adjust flow rate, and the rotating speed of driving motor of main pump is controlled by variable voltage variable frequency (VVVF) technology. Three-level structure of control system was employed. A “double-object synchronization” control scheme enables 112 cylinders to coordinate the extending action, and automatically achieve synchronous motion and posture control of box and uniform load distribution to each pump unit. Differences are controlled within ± 40 mm during the whole jacking process.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.