Abstract

SummaryTesting for small‐delay defects (SDDs) has become an important component of integrated circuit testing. In this paper, an efficient small‐delay fault simulator, a hybrid method combining forward serial simulation and backward critical path tracing simulation for SDDs is proposed, which aims to determine the coverage of small‐delay defects for a given test set fast and accurately. In our proposed method, a unit delay model is employed, and reconvergent sensitization as well as hazard‐based detection is considered. Signal waveforms are expressed by bitmap data forms. In addition to providing an accurate result for fault simulation, the proposed simulator can well assist test generation. Experimental results demonstrate that the proposed simulator can further accelerate the simulation by one or two orders of magnitude compared with previous works. Copyright © 2014 John Wiley & Sons, Ltd.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.