Abstract

Critical path tracing (CPT) is an approximate algorithm used for fast fault simulation, as part of test generation algorithms. It partitions the circuit to be simulated into fanout free regions in order to simplify decisions regarding the propagation of logic signal changes through the circuit. Presented are concepts that result in faster decision making than in CPT for many combinations of input changes. After true value simulation, improved critical path tracing (ICPT) does a more extensive classification of lines than CPT does. This finer classification determines propagation of fault effects without fault simulation in many cases where CPT may require fault simulation. The increase in execution time to incorporate the improvements is insignificant compared to the savings in simulation time for many input vectors. >

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.