Abstract

The problem of scheduling in a flowshop is considered with the objective of minimizing the total weighted flowtime of jobs. A heuristic algorithm is developed by the introduction of lower bounds on the completion times of jobs and the development of heuristic preference relations for the scheduling problem under study. An improvement scheme is incorporated in the heuristic to enhance the quality of its solution. The proposed heuristic, with and without the improvement scheme, and the existing heuristics are evaluated by a large number of randomly generated problems. The results of an extensive computational investigation for various problem sizes are presented. It has been observed that both versions of the proposed heuristic perform better than the existing heuristics in giving a superior solution quality and that the proposed heuristic without the improvement scheme yields a good solution by requiring a negligible CPU time. In addition, an experimental investigation is carried out to evaluate the effectiveness of the improvement scheme when implemented in the proposed heuristic and the existing heuristics, as well as the effectiveness of a variant of the scheme. The results are also discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.