Abstract

A model of production assignment (PA) planning and equipment changeover scheduling (ECSP) for printed wiring board (PWB) assembly systems at the aggregate level is developed. In the described model, three kinds of equipment changeover methods, i.e. adding machine, removing machine and transferring machine, are involved. Since the ECSP model is a large-scale integer-programming problem, two approximate solution approaches for single period problem are described, which will provide a search space for finding a solution to the multiple-period problem. Computational experiments confirm the conclusions.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call