Abstract

This paper reviews and critically assesses procedures which have been adopted to evaluate Advanced Transport Telematics (ATT) projects. The importance of such a review at this juncture stems from the changing position of ATT in transport planning. ATT is no longer simply a field for experimentation, where technical feasibility and user acceptance are dominant concerns. Rather it is a potential mainstream contributor to the functioning of road transport systems. For this reason, ATT project appraisal needs to be developed to the same form, level of sophistication and consistency as the appraisal of conventional transport infrastructure investment. Based on the review set out here, we argue that appropriate methods have not yet been established which, in turn, poses a number of challenging questions, since current socio‐economic evaluation procedures are not directly suited to either measuring or evaluating many of the impacts which ATT schemes are implemented to achieve.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.