Abstract
The paper presents an on-line algorithm that has been developed with the intention of predicting the adequate starting time for a single new batch in a system consisting of two chemical reactors sharing a common discharge vessel. The validation of the achieved results, derived from the algorithm testing, show that the proposed algorithm can significantly contribute to more stable production and can efficiently deal with the “no-wait” constraints and the non-uniform batch durations of the dedicated process.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.