Abstract
This paper addresses a problem arising in the coordination between two consecutive stages of a production system. Production is organised in batches of identical jobs. Each job is characterised by two distinct attributes, and all jobs sharing the same attributes are processed together as a single batch. Due to the structural and organisational characteristics of the production system, the two stages have to process the same batch sequence. When two consecutive batches with different attributes are processed, at least one stage must pay a setup, in order to reconfigure its own devices. Each stage incurs a setup cost that is a general non-decreasing function of the number of its own setups, and the problem consists of finding a batch sequence minimising the total setup costs of the production system. We present an original solution approach for the considered problem that is shown to be very effective using an extensive experimental campaign.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.