Abstract

A simulation model is developed to optimize dragline selection for surface mines with one flat-lying coal seam where pullback stripping is applied. Recognizing that a dragline that runs in round-the-clock fashion is the key to an efficient operation, two objectives are set in the model so as to select a dragline with the least waiting time after realizing the excavation and with the minimum stripping cost. A set of equations is generated to formulate required pit dimensions resulting from interactions between the dragline and the pit. The model is provided with a set of geometric and operative constraints towards generating outcomes that are appropriate to the nature of the mode of operation. Evaluation is done with hypothetical data. Results of the model simulation are discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.