Abstract
This paper describes an approach for unit start-up sequence determination during power system restoration. This approach is based on the backtracking search method, which determines the generating starting times to maximize the MWh load served over a restoration period and guarantee optimality of the start up sequence. The dynamic characteristics of different types of units and system constraints have to be considered. The shortest path, i.e., the path that requires the minimal number of switching actions, between the supplying unit and load is selected unless it is not feasible. Simulation tests, carried out on 39-bus New England test system, verify the effectiveness of the proposed method.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.