Abstract

We apply a neural network approach for solving a one-machine sequencing problem to minimize either single- or multi-objectives, namely the total tardiness, total flowtime, maximimum tardiness, maximum flowtime, and number of tardy jobs. We formulate correspondingly nonlinear integer models, for each of which we derive a quadratic energy function, a neural network, and a system of differential equations. Simulation results based on solving the nonlinear differential equations demonstrate that our approach can effectively solve the sequencing problems to optimality in most cases and near optimality in a few cases. The neural network approach can also be implemented on a parallel computing network, resulting in significant runtime savings over the optimization approach.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.