Abstract
AbstractFor the single‐machine scheduling problem with the objective of simultaneously minimizing total flow time and number of tardy jobs, a lower bound on the number of efficient sequences is known. However, the proof thereof, which makes use of a modified version of Smith's algorithm, is unduly lengthy and sophisticated. Adopting a totally new point of view, we present in this short article a much simpler proof based on the naive idea of pairwise interchange. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 346–348, 2016
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.