Abstract

In this paper, we apply a simulated annealing approach to two bicriteria scheduling problems on a single machine. The first problem is the strongly NP-hard problem of minimizing total flowtime and maximum earliness. The second one is the NP-hard problem of minimizing total flowtime and number of tardy jobs. We experiment on different neighbourhood structures as well as other parameters of the simulated annealing approach to improve its performance. Our computational experiments show that the developed approach yields solutions that are very close to lower bounds and hence very close to the optimal solutions of their corresponding problems for the minimization of total flowtime and maximum earliness. For the minimization of total flowtime and number tardy, our experiments show that the simulated annealing approach yields results that are superior to randomly generated schedules.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.