Abstract

There are two alternatives for production organisation in precast factories, namely the comprehensive method and the specialised method. Production scheduling under the specialised alternative has been found to be a difficult optimisation problem if heterogeneous elements are involved. A flow shop sequencing model is developed for this kind of production scheduling that considers the constraints encountered in actual practice. The model is optimised using a genetic algorithm (GA) approach. The results are compared with those obtained using classical heuristic rules in two examples that involve the objective of minimising the makespan or the total tardiness penalty. The comparison shows that the GA can obtain good schedules for the model, giving a family of solutions that are at least as good as those produced by the heuristic rules.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.