BIM has huge potential in the construction industry, but the development in the field of project cost is not as good as expected. In this paper, the factors that prevention BIM implemented in project cost were sorted out, and the factors were graded by questionnaires, then factor analysis method and importance index were used to calculate the biggest influence factor of BIM in project cost. This paper puts forward some measures from the perspectives of personnel, software, cost and enterprises, such as strengthening cooperation between universities and enterprises to cultivate fine talents, increasing scientific research investment to perfect BIM cost software, enriching BIM learning resources to increase the study enthusiasm of cost workers, and establishing reasonable cost-sharing mode. In order to promote the development of project cost information in China.

Highlights

  • Along with the progress of the whole construction industry, the project cost information has got certain development

  • The BIM5D technology, which is beneficial to cost management, can be used to simulate the construction process by combining the building model, schedule and cost management with the BIM platform, and provide contract management information

  • The result is a list of 18 obstacles of BIM in the project cost, as Table 1

Read more

Summary

Introduction

Along with the progress of the whole construction industry, the project cost information has got certain development. Gao et al [1], Xu et al [2] respectively used factor analysis, DEMATEL analysis and ISM analysis to study the influencing factors of the application of BIM in China's construction industry and corresponding countermeasures and suggestions were put forward. It provided reference for perfecting BIM application standard and promoting the popularization of BIM in China.

Obstacles to the development of BIM in the cost industry
Questionnaires design and distribution
Data processing
The importance of calculating key obstacle factors
Suggestions
Findings
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.