Abstract

Meeting due dates as a reflection of customer satisfaction is one of the scheduling criteria that is frequently encountered in today's manufacturing environments. The natural quantification of this qualitative goal involves tardiness related measures. In this study, we consider the dynamic job shop scheduling problem with the weighted tardiness criterion. After we present a comprehensive literature survey on the topic, we measure the long-run performances of more than 20 single-pass dispatching rules under various experimental conditions. In this study, we pay special attention to recently proposed dispatching heuristics such as CEXSPT, CR+ SPT, S/RPT+ SPT, and Bottleneck Dynamics (BD). We also investigate the effects of six resource pricing schemes proposed recently for BD. Moreover, we extend the earlier versions of inserted idleness and identify the conditions in which these techniques can be applied without incurring too much computational cost. Future research directions are also outlined in light of the computational results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.