Abstract

Recent advances in approaches and production technologies for the production of goods and services have made just‐in‐time (JIT) a strong alternative for use in intermittent and small batch production systems, especially when time‐based competition is the norm and a low inventory is a must. However, the conventional JIT system is designed for mass production with a stable master production schedule. This paper suggests supplementing the information provided by production kanbans with information about customer waiting lines to be used by operators to schedule production in each work‐station of intermittent and small batch production systems. This paper uses simulation to analyze the effect of four scheduling policy variables—number of kanbans, length of the withdrawal cycle, information about customer waiting lines, and priority rules on two performance measures—customer wait‐time and inventory. The results show that using information about customer waiting lines reduces customer wait‐time by about 30% while also reducing inventory by about 2%. In addition, the effect of information about customer waiting lines overshadows the effect of priority rules on customer wait‐time and inventory.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call