Abstract

In this paper, a planning model for active distribution network (ADN) is proposed considering distributed energy resources (DERs) and distribution network expansion planning (DNEP) to cope with load growth and to maximize profits to the distribution system operator (DSO). The DERs considered in this paper include distributed renewable energy resources (RESs), distributed thermal generators (TGs), and battery energy storage system (BESS). DNEP options, such as adding new lines to the distribution network (DN) and upgrading existing lines are taken into account. The main motivation of this research is to find the optimal sizing and siting of DERs with considering DNEP to meet the load growth requirements and to maximize the total payoff to the DSO. The DSO trades energy externally with an independent system operator (ISO) at the market-clearing price (MCP) and internally with consumers at a predetermined cost. The overall performance of the proposed model is investigated on a 38-bus radial distribution test system. Simulation results indicate that considering DERs contributes to maximizing the total payoff to DSO and meeting the load growth requirements. In addition to that DERs can relieve the congestion in the DN's lines; therefore, it can mitigate or postpone DNEP's investment.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.