Abstract

Increasing the Main Injector beam power above ∼ 1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. In this paper, we consider an 8 GeV linac Booster replacement that produces 8 GeV H- beam for injection into the Recycler Ring or Main Injector. This upgrade will maximize the beam available for neutrino production for the long baseline DUNE experiment to greater than 2.5 MW and enable a next generation of intensity frontier experiments. The 8 GeV linac takes ∼ 1 GeV beam from the PIP-II Linac and accelerates it to ∼ 2 GeV in a 650 MHz superconducting RF linac, followed by a ∼ 2 to 8 GeV pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in superconducting RF technology. The linac configuration and beam dynamics requirements are presented. Injection options are discussed, including use of an 8 GeV Accumulator Ring. Foil-based injection is the present standard but R&D toward implementing laser-assisted injection could enable a significant improvement. Research needed to implement the Booster replacement is described.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.