Abstract
The 200 GeV accelerator at Batavia is due to begin operations in 1972. It differs from earlier designs in having a booster synchrotron. As a consequence, the main ring magnets are considerably smaller than previously.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have