Abstract
A variant of the High Multiplicity Multiprocessor Scheduling Problem with C job lengths is considered, in which jobs can be processed only by machines not greater than a given index. When C=2, polynomial algorithms are proposed, for the feasibility version of the problem and for maximizing the number of scheduled jobs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.