Abstract

In this paper we present algorithms for the problem of scheduling n independent jobs on m identical machines. As a generalization of the classical multiprocessor scheduling problem each machine is available only at a machine dependent release time. Two objective functions are considered. To minimize the makespan, we develop a dual approximation algorithm with a worst case bound of 5/4. For the problem of maximizing the minimum completion time, we develop an algorithm, such that the minimum completion time in the schedule produced by this algorithm is at least 2/3 times the minimum completion time in the optimum schedule. The paper closes with some numerical results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.