Airport Collaborative Decision Making (ACDM) flight scheduling plans rely on accurate predictions of both optimal and reliable aircraft turnaround times, which is one of the most difficult things to complete. In order to account for the effects of randomness and fuzziness on the turnaround process duration, this paper deals with transforming the probability distribution of well-fitted sub-processes into a cumulative density function, which is equivalent to the fuzzy membership function (FMF), and then using goodness-of-fit to determine the fuzzy membership grade of each turnaround sub-process. The turnaround time is calculated using the fuzzy critical path method (FCPM), which is a combination of the Critical Path Method (CPM) and fuzzy set theory. In order to verify this estimate, we created the FMF using historical data and compared it to turnaround times based on FCPM. A linear regression model is used to examine the relationship between arrival delays and the FCPM-based turnaround process. We also use historical data to generate fuzzy sets of different arrival delays using Frankfurt airport data from the summer of 2017 and conclude that delays are positively correlated with the FCPM-based turnaround process.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call