Abstract

The aim of the article is to study the features of the development of cluster systems for the construction of transport vessels and develop on this basis recommendations for the use of agile methodology in the mechanisms of effective management in cluster integrations. The characteristic features of a project-oriented operating system with a matrix organizational structure have been determined. The principles of the agile methodology have been adapted to the management mechanisms of the shipbuilding cluster system. The examples of the use of agile approaches that complement and strengthen the existing matrix management structure in the shipbuilding cluster system are given. The agile approaches are implemented through: maintaining stable links in the supply chain at all stages of the life cycle of the cluster; focusing the cluster system as a whole on customer needs; creation of cross-functional teams for support and development of human resources; creation of a logistics center in accordance with the agile methodology, which is implemented through short feedback cycles and regular adaptation of supply processes; lean production ‒ from design to production at all stages. It is proposed to develop a corporate information system in business processes and supply chains of the shipbuilding cluster. Information flows connect cluster members, functions, supply chain management tasks, as well as different levels of management decision-making. Team cooperation between representatives of project organizations and the project management office of shipbuilding enterprises will ensure the development of the information system as a whole, as well as the integrity and consistency of individual elements. This confirms that the agile methodology provides flexibility in management and operational adaptation to changes in order to achieve the main goal ‒ the competitiveness of cluster integration and its elements.

Highlights

  • The current state of economic development is characterized by the emergence and development of new relationships, the basis of which is the cooperation of manufacturers, suppliers, users in order to integrate business process management throughout the product life cycle

  • The influence of non-production factors on the economic system is increasing: supply, sales, service, etc. This requires the search for new approaches to management mechanisms, which are based on the development of inter-industrial relations, the integration of communication channels between suppliers, users, manufacturers

  • The basis of the agile methodology is flexible models and mechanisms implemented in the format of iterative refinement to achieve the best end results of projects

Read more

Summary

Introduction

The current state of economic development is characterized by the emergence and development of new relationships, the basis of which is the cooperation of manufacturers, suppliers, users in order to integrate business process management throughout the product life cycle. The influence of non-production factors on the economic system is increasing: supply, sales, service, etc This requires the search for new approaches to management mechanisms, which are based on the development of inter-industrial relations, the integration of communication channels between suppliers, users, manufacturers. In work (Zaporozhets I.M., 2018; 183), the scheme of decomposition of production processes as a basis of formation of network model of the project in the vessel construction is offered and substantiated These studies are mainly aimed at the development of planning models for shipbuilding projects. The basis of the agile methodology is flexible models and mechanisms implemented in the format of iterative refinement to achieve the best end results of projects These principles have emerged in the field of software development, since they have been successfully used in many other areas (Agile: A Practical Guide, 2018). Introduction of the agile methodology principles into the portfolio management system of transport vessel construction and repair projects in the conditions of cluster integration

Statement of the main research material
Conclusions
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call