Abstract

A growing number of local energy conflicts around wind power and power-grid extensions are slowing down the deployment of the German Energiewende. In this paper, a local conflict on wind energy in the state of Baden-Württemberg is analysed in detail. In the little community of Engelsbrand, local opposition against a planned wind park was able to turn around a set of favourable a priori conditions, such as a supporting state government planning process, a local supporter group, a transparent planning process, including a majority vote pro wind energy, and a round table discussion. Distancing itself from the NIMBY-explanation (‘Not In My Back Yard’), the paper applies insights from discourse network analysis and micro-sociology in order to study the local conflict dynamics. Special attention is given to the resource mobilisation strategies of the opponents, including social networks, mass and social media use. The paper ends by drawing some general conclusions for the German Energiewende.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.