Abstract

The testing approach is facing many difficulties regarding the actual implementations in the modern smart power grids. One of these challenges is the testing of hardware devices such as protective relays, PMUs, and smart meters before its final deployment to the power grid. One way to overcome this is the real-time simulation of power grid. The hardware-under-test (HuT) is plugged to a real-time simulator via signal conditioning circuit (SCC). SCC is an interface circuit involving power amplifier and measurement sub-circuit between the real-time power grid simulator and the HuT. In this chapter, some advanced developed techniques and approaches will be presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.