Abstract

This article analyzes the modeling and describes the algorithmic breakthroughs and the use of parallel processing in power system dispatcher training simulation. The first industrial version of the FAST-DTS simulator (running a 400 node, 80 generator power system), with its advanced instructor and operator stations, is described and illustrated with various training scenarios. Principles used for the configuration and the compatibility with EUROSTAC (reference software dedicated to the dynamic simulation of power systems in the field of transient and long-term stability) and further developments are also discussed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.