Abstract
Max chart uses a single chart to control the process mean and variance. It performs with similar efficiency to joint and s charts. This study combined adaptive chart and Max chart to increase the detecting ability. A Markov chain approach was used to develop the statistical indicator and statistical design model of adaptive Max charts. This study designed adaptive Max charts to detect the mean shift and variance increase, and measured their performance for comparison with EWMA, CUSUM, and double-sampling charts. A comparison study revealed that the adaptive Max charts with variable parameter exhibited superior performance to detect the small shift than that of EWMA, CUSUM, and double sampling charts.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of the Chinese Institute of Industrial Engineers
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.