Abstract

Tensegrity structures are spatial self-stressed pin-jointed structures where compression components (struts) are surrounded by tension elements. This paper describes a near full-scale deployable tensegrity footbridge that deploys from both sides and connects at mid-span. Two topologies that differ in terms of symmetry of elements and paths of continuous cables are compared. Although both topologies behave similarly with respect to serviceability criteria, there is a significant difference in behavior during deployment. A two-stage control methodology for the connection of both halves of the footbridge is presented. The control methodology determines active cable length changes based on computational control and measurement of the response of the structure during deployment. Both halves are successfully connected at the end of deployment.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.