Abstract
A large broadcast center such as this requires severe acoustic criteria. The concept provided protection from various intrusions by locating the technical facilities towards the inside of the new building. The sound isolation was achieved by «floating » the building of resilient pads and by building sound barriers such as concrete floating floors, resilient ceiling membrane, and multiple-cavity walls. Once the required privacy was achieved, the production areas were «tuned» using sound-absorbing materials installed mainly on the walls and the ceiling
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.