Abstract

Through the last decade, Integrated Project Delivery (IPD) methodology considers one of the new contractual relations that are also on the way to further integrate the process of combining design and instruction. On the other hand, Building Information Modeling (BIM) made significant advancements in coordinating the planning and construction processes. It is being used more often in conjunction with traditional delivery methods. In this paper, the researcher will present the achievement of IPD methodology by using BIM through applying on the design of the financial commission building in Mayssan Oil Company in Iraq. The building has not been constructed yet and it was designed by using 2D CAD drawings. The researcher will redesign the project by using BIM to eliciting the abilities that are consistent with the requirements and benefits of integrated project delivery (IPD). The results show that BIM is an appropriate technology that can be used with the IPD method because it has achieved most of the requirements and benefits of IPD.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call