Abstract

Recent technological advances have made it possible to map and model disturbed mine areas to plan the most cost effective manner in which to reclaim post mine land. The process not only can reduce the cost to reclaim each acre, but also enhances regulatory compliance. Results from a 21 acre test at Texas Utilities Mining Company`s Martin Lake-Oak Hill Mine have shown a significant reduction in dozer hours per acre to complete reclamation. A larger, more conclusive project has been completed at TUMCO`s Monticello-Winfield North Mine. The new project includes approximately 350 acres of the C-Area final pit. Results of this project have resulted in substantial cost savings versus conventional reclamation planning methods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.